Skip to content
v0.2.0

Risk register workspace

The core risk register: capture risks with owners, ratings, categories, and next-review dates in one structured workspace.

The register is the heart of RiskCurb. This release introduces the structured workspace teams build everything else on.

Highlights

  • Capture enterprise, operational, project, and strategic risks
  • Owner, accountable department, and service-area tagging
  • Inherent and residual rating with next-review scheduling
  • Status history on every risk

A single, accountable home for risk, and the starting point for connecting controls, claims, and reporting.

Updates

Bring risk into view

Registers, controls, claims, and reporting in one governed system. Request a walkthrough with your own risk landscape.

See Pricing