Skip to content
Risk registers

A connected register for every risk

Centralize enterprise, operational, project, strategic, and departmental risks in one structured register, each with an owner, rating, status, next review, and treatment link.

All Features
RiskOwnerSeverity
Vendor concentration in claims processingProcurementHigh
Bridge inspection backlogPublic WorksCritical
Fleet insurance renewal gapFinanceModerate
Records retention non-complianceClerkLow
Flood exposure at depot sitesEmergency MgmtHigh
The problem

What it solves

The everyday friction this removes from public-sector risk work.

Risks live in disconnected spreadsheets

One register every department works from

Ownership and ratings drift out of date

Owner, rating, and next review on every risk

Treatments are hard to trace

Each risk links to its controls and treatments

In the product

Where the work happens

An illustrative view of the working surface. All figures are example data.

RiskOwnerSeverity
Vendor concentration in claims processingProcurementHigh
Bridge inspection backlogPublic WorksCritical
Fleet insurance renewal gapFinanceModerate
Records retention non-complianceClerkLow
Flood exposure at depot sitesEmergency MgmtHigh
How it works

From entry to linked treatment

Each step backed by a working surface, not a static slide.

01
Step 01

Capture the risk

Log the risk with category, likelihood, impact, and owner.

02
Step 02

Rate and assign

Set inherent and residual rating and an accountable owner.

03
Step 03

Connect treatment

Link controls, treatments, and the next review date.

Capabilities

What the register holds

Structured fields and tracked follow-up, not free text in a spreadsheet.

01Enterprise, operational, project, and strategic risk types
02Owner, department, and service-area tagging
03Inherent and residual rating
04Next-review scheduling
05Treatment and control linkage
06Status history
Outcomes

What changes

  • Register reviews start from current data, not a rebuild.

  • Ownership questions end in seconds instead of email threads.

  • Audit and board questions draw on one traceable record.

FAQ

Common questions

Enterprise, operational, project, and strategic risks live in the same register, each with its own owner, ratings, and review schedule.
Let's Talk

Bring risk into view

Registers, controls, claims, and reporting in one governed system. Request a walkthrough with your own risk landscape.

See Pricing